Arsham Metallic Factory And Industrial Company Short For Arsham Factors. Is A Branch Of Sari Sazeh Company And Has Been Built In 2008 In A Land 52,000 m2 In Industrial Town.
The Company Has Done Lots Of Projects Using Machinery In Different Fields.
Physical Info :
1-Land Of 52000 m2
2-General Niches With 8000 m2
3-Management Building In 400 M2
4-Technical Office In 100 m2
5-Dining Room And Changing Room In 15 m2

Some Projects Done By Arsham Factory
Description Of Some Projects That This Factory Has Done :
1-Bridge Of Shahid Nouri (Grade Separation)
2-Metal Grader In Overpass Of Bridge In Ring Road Of Neka-Sari
3-Metal Grader Overpass Galoogah
4-Incinerator Powerhouse Of Sari
5-Khalili Mall
6-Proma Mall
7-Airport Dasht Naz:
8-Abolfazl Clinic
9-Saderat Bank Supervisor
10-Sport And Pool Complex of Qaemshahr
11-Hafezi Mall
12-Velayat Park:
13-Sport Complex of Behshahr
14-Metal Griders of Overpass In Bojnourd
15-Metal Griders of panbeh chole
16-Steel structure of Mazandaran trade room Building
Equipment's
Cutting And Holes In Sheets
Row | Caption | Model | Number | |
---|---|---|---|---|
1 | Cutting Sheet Guillotine To 25 mm With Length Of 6 m
| PAYA Boresh
| 1 | 1 |
2 | Puncher
| FG 200
| 1 | |
3 | Radial Derail
| Z3050 | 2 | |
4 | Fire Saw
| Y22
| 3 | |
5 | Cutting Rail
| OLKE-MAX3
| 5 |
Welding Sheets And Paint
Row | Caption | Model | Number |
---|---|---|---|
1 | Welding Powder
| Gam Electronic
| 2 |
2 | Welding Co2
| Pars Mig
| 10 |
3 | Welding Fire
| Mini El251-Pars
| 15 |
4 | Heater Dryer
| Gam Electric
| 3 |
5 | Sand Blast And Paint
| – | 1 |
Equipment's For Transferring
Row | Caption | Model | Number |
---|---|---|---|
1 | Ceiling Crane
| 10 Ton
| 4 |
2 | Ceiling Crane
| 3.2 Ton
| 2 |
3 | Welding Fire
| Mini El251-Pars
| 15 |
4 | Heater Dryer
| Gam Electric
| 3 |
5 | Sand Blast And Paint
| – | 1 |
Physical Information Of Factory
Images Of Factory`s Equipments
Images Of Project Done By Arsham Metalic Factory
Images Of Project Done By Arsham Metalic Factory
Images Of Project Done By Arsham Metalic Factory
Images Of Project Done By Arsham Metalic Factory
Pictures of completed projects of industrial works-chimney of waste incinerator power plant
It consists of 5 pieces of 12 meters that are mounted on each other and finally ends at a height of 60 meters.
Pictures of completed projects of industrial works - grating