Employer:   Construction and development of the country's transportation infrastructure
شرکت: ساری سازه
Supervisory body:  Senate strategy consulting engineers
The final amount of the contract:  319,034,000,000 Rials

Introducing the plan:

In this plan, a metal bridge device with a width of 8.12 meters, which includes three spans with lengths of 36 and two spans of 18 meters and a total of 72 meters in the vicinity of the Sari-Takam axis and the creation of the access road to the village of Golord and the paths leading to it. will be

Project size

– Excavation: 5,073 cubic meters

– Concreting: 7,400 cubic meters

– Reinforcement: 470,000 kg

– Heavy steel structures: 220,000 kg

– Excavation: 800 meters long

– Asphalt: 635 tons