Employer:  General Department of Roads and Urban Development of Mazandaran Province
Company: Sari Sazeh
Supervision:  Tabaristan Green Road Consulting Engineers
The final amount of the contract:  320,000,000,000 Rials

Introducing the plan:

This project located in Farah Abad on Tajen river is under construction. The remaining main operational operations of the route include earthworks and all necessary works for road infrastructure, pavement operations, construction of reinforced earth walls and construction of technical buildings.

The physical characteristics of this bridge are 100 meters span, three spans 39, 33 and 28 meters long and the width of the bridge deck is 12.1 meters. At present, 12 columns of the bridge and the heads of the columns and the bridges have been completed.

With the construction of this bridge on the Tajen River, the way of access for travelers and tourists in the areas of goharbaran and Farah Abad will be opened to use the beaches, which will lead to the development of this area in terms of economy and tourism. And due to the existence of the special economic zone of Amirabad port in the eastern part of the said bridge, the completion and operation of the bridge will connect the communication corridor of Amirabad port to the west of the province through the Sari-Khazarabad road.