Employer : Ministry of Roads and Urban Development
Company : Infrastructures of the country
Monitoring:  Faradid Consulting Engineers
Contract amount including adjustment and 25%:   2,500,000,000,000 Rials

Introducing the plan

A part of Jahrom’s connection to the rail network is located in the area between the north of Jahrom city. This piece starts after the vicinity of Jahorm Road police station at km 0+000 and continues to km 30+000 after passing through Keshe Barfi river.

The main operations of the project include the following:

  1. A) Carrying out ground operations on or off the road
  2. b) Implementation of technical building operations, including bridges, small bridges, walls and protective works
  3. c) Construction of an access road to the stations in the form of a two-lane asphalt road
  4. f) Preparing, transporting and spreading is below, and preparing the surface for spreading is above

Sub-operations

Construction of access roads – Service road construction – Exploitation of loans and other sources of material supply – Provision of necessary materials such as cement, iron, sand and stone – Planting and uprooting the surface of the road bed and its sanctity in necessary places – Construction Monitoring offices and soil mechanics laboratory – preparation and installation of warning signs

Project size:

Excavation operation of 1,470,000 cubic meters

842,000 cubic meter embankment operation

24,500 cubic meters of concrete

Rebar 237,300 kg