Employer:  Babolsar Municipality
Company: Sari Sazeh
Supervision:  Fara tarahan yekta khazar
The final amount of the contract:  474,258,189,110 rials

Activities of Arsham Mazand company in this project:

Implementation of the second bridge of Shazdeh Roud with an area of ​​about 800 square meters

The bridge is in the form of a span approximately 5.29 meters long with continuous steel box girders on the abutments, which includes two one-way crossing lanes with a width of 2.7 meters, a refuge with a width of 0.35 meters, a sidewalk to The width of 3 meters and two cornices, each with a width of 0.35 meters, will be implemented.

Project size

– Excavation and piling: 6,190 cubic meters

– Embankment: 3,600 cubic meters

– Excavation: 616 meters long

– Masonry operation with stone: 1,512 cubic meters

– Layout: 3,210 square meters

– Steel works: 357,045 kg

– Concreting: 3,200 cubic meters

– Asphalt: 120 tons